The Solar Energy Corporation of India has invited bids for developers to provide 4800 MWh of assured peak supply from interstate transmission system-connected renewable energy projects in India.
News
SECI Invites Bids for Peak Power Supply from ISTS-Connected Renewable Projects
SECI seeks 4800 MWh of assured peak supply from renewable projects

The Solar Energy Corporation of India has invited bids for developers to provide 4800 MWh of assured peak supply from interstate transmission system-connected renewable energy projects in India.
Where This Came From
Read More CFS Global summarised and checked this against Mercom India. Read their version before you act on it — that is where the detail and the liability sit.
